Claim Missing Document
Check
Articles

Found 4 Documents
Search
Journal : Jurnal Rekayasa elektrika

Optimasi Penempatan dan Kapasitas PLTS on grid Pada Sistem Distribusi Radial Menggunakan Metode Algoritma Genetika Multi Konstrain Muammar Zainuddin; Haditsah Annur
Jurnal Rekayasa Elektrika Vol 15, No 1 (2019)
Publisher : Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (902.812 KB) | DOI: 10.17529/jre.v15i1.12507

Abstract

The photovoltaic grid-connected business opportunity offers challenges to power quality and voltage fluctuations in the distribution system. The purpose of this study is to optimize the location and power capacity of the grid-connected photovoltaic so that the voltage values are in accordance with the operating standards and meet the requirements of the connection techniques in the distribution system. The distribution system tested is the 69 Buses radial distribution feeder. The optimization uses three constraints namely voltage constraints, active power capacity constraints and total active power capacity constraints of the Grid-Connected Photovoltaic. The Optimization is carried out by considering the value of the percentage of the total active power of the Grid-Connected Photovoltaic capacity to the total load in the distribution system. The optimization results in the first simulation indicated seven grid locations with a total active power of 1.156 MW (38% PV) and produced a fitness value of 0.029. The second Simulation showed 7 locations with a total active power of 1.243 MW (41% PV) and produced a fitness value of 0.023. The Third simulation was identified with 11 locations with a total active power of 1.385 MW (46% PV) and produced a fitness value of 0.022. The best fitness value is the lowest value of the active power losses. The entry of a number of the Grid-Connected Photovoltaic System with distributed location can increase the voltage level in the distribution system.
Analisa Masuknya Gardu Induk Anggrek dan Rekonfigurasi Jaringan Terhadap Kualitas Tegangan dan Rugi-rugi Daya (Studi Kasus PLN Rayon Kwandang Area Gorontalo) Muammar Zainuddin; Luthfi Wiraputra
Jurnal Rekayasa Elektrika Vol 12, No 3 (2016)
Publisher : Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1114.654 KB) | DOI: 10.17529/jre.v12i3.4234

Abstract

The quality of the overhead distribution voltage with a length of ± 190,57 kms, in the North Gorontalo district has not met the National Standard for the distribution voltage yet. This causes a voltage drop along the distribution line at 21% during the peak load and the power loss at 219 kW. This paper aims to find the best solution for improving the voltage quality of the distribution line to meet the standard operation voltage for the medium distribution line. The Newton-Raphson method is used to analyze the power flowing along the distribution line and the voltage at their buses. There are three scenarios purposed in this study. The first scenario is to uprate the conductor size (in LK. 01 feeder), the second scenario is to reconfigure the distribution network after the Anggrek Substation was connected to the system and the third scenario is to combine the first and the second scenarios, i.e. uprating conductors and reconfiguring the network. From the three scenarios, the results show that the first scenario has a voltage drop of 19,8%,  the second scenario causes a voltage drop of 8,8% and the third scenario produces the voltage drop of  4,8%. Based on this results, it can be concluded that the third scenario can improve the line voltage much better than the other two scenarios with the power loss of up to 52,4 kW. The Entry of Anggrek Substation must accompany by conductor uprating in line distribution to reach limit voltage standard operation.
Optimasi Penempatan dan Kapasitas PLTS on grid Pada Sistem Distribusi Radial Menggunakan Metode Algoritma Genetika Multi Konstrain Muammar Zainuddin; Haditsah Annur
Jurnal Rekayasa Elektrika Vol 15, No 1 (2019)
Publisher : Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17529/jre.v15i1.12507

Abstract

The photovoltaic grid-connected business opportunity offers challenges to power quality and voltage fluctuations in the distribution system. The purpose of this study is to optimize the location and power capacity of the grid-connected photovoltaic so that the voltage values are in accordance with the operating standards and meet the requirements of the connection techniques in the distribution system. The distribution system tested is the 69 Buses radial distribution feeder. The optimization uses three constraints namely voltage constraints, active power capacity constraints and total active power capacity constraints of the Grid-Connected Photovoltaic. The Optimization is carried out by considering the value of the percentage of the total active power of the Grid-Connected Photovoltaic capacity to the total load in the distribution system. The optimization results in the first simulation indicated seven grid locations with a total active power of 1.156 MW (38% PV) and produced a fitness value of 0.029. The second Simulation showed 7 locations with a total active power of 1.243 MW (41% PV) and produced a fitness value of 0.023. The Third simulation was identified with 11 locations with a total active power of 1.385 MW (46% PV) and produced a fitness value of 0.022. The best fitness value is the lowest value of the active power losses. The entry of a number of the Grid-Connected Photovoltaic System with distributed location can increase the voltage level in the distribution system.
Analisa Masuknya Gardu Induk Anggrek dan Rekonfigurasi Jaringan Terhadap Kualitas Tegangan dan Rugi-rugi Daya (Studi Kasus PLN Rayon Kwandang Area Gorontalo) Muammar Zainuddin; Luthfi Wiraputra
Jurnal Rekayasa Elektrika Vol 12, No 3 (2016)
Publisher : Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17529/jre.v12i3.4234

Abstract

The quality of the overhead distribution voltage with a length of ± 190,57 kms, in the North Gorontalo district has not met the National Standard for the distribution voltage yet. This causes a voltage drop along the distribution line at 21% during the peak load and the power loss at 219 kW. This paper aims to find the best solution for improving the voltage quality of the distribution line to meet the standard operation voltage for the medium distribution line. The Newton-Raphson method is used to analyze the power flowing along the distribution line and the voltage at their buses. There are three scenarios purposed in this study. The first scenario is to uprate the conductor size (in LK. 01 feeder), the second scenario is to reconfigure the distribution network after the Anggrek Substation was connected to the system and the third scenario is to combine the first and the second scenarios, i.e. uprating conductors and reconfiguring the network. From the three scenarios, the results show that the first scenario has a voltage drop of 19,8%,  the second scenario causes a voltage drop of 8,8% and the third scenario produces the voltage drop of  4,8%. Based on this results, it can be concluded that the third scenario can improve the line voltage much better than the other two scenarios with the power loss of up to 52,4 kW. The Entry of Anggrek Substation must accompany by conductor uprating in line distribution to reach limit voltage standard operation.